top of page
Screenshot 2026-06-23 at 12.06.05 PM copy.jpg

Follow the Build: 911 Alta Vista Drive

Watch our Altadena model home come to life — from early site work and foundation preparation to framing, exterior details, interior finishes, and final walkthrough.

Altadena Model Home | Plan 206 | Mission Revival

ADU + Detached Garage

A real-time look at rebuilding in Altadena

This model home gives homeowners a way to see the rebuild process unfold in real time. As construction progresses, we’ll share updates from the field, explain what is happening at each stage, and highlight the decisions, details, and site considerations that shape a successful rebuild.

 

This is not just about one home. It is a way to help Altadena homeowners better understand what to expect as they begin planning their own rebuild.

Altadena_206-Mission Revival_v2 web.jpg

Altadena Model Home

Screenshot 2026-06-24 at 11.43.55 AM copy.jpg

911 Alta Vista Drive

Gemini_Generated_Image_206 PLAN v2.png

The 206, Mission Revival

182a273a-5628-4c4e-91f4-668416c60a48.jpg

Framing

Construction Milestones

Preconstruction & Permitting

1.

Design, engineering, site planning, plan check, permits, and scheduling happen before visible construction begins.

Site Work & Excavation

2.

The lot is prepared for construction, including grading, excavation, and utility coordination.

Foundation

3.

Footings, foundation walls, slab work, waterproofing, and drainage details are completed as needed.

Framing

4.

Walls, floors, roof structure, and sheathing bring the home’s shape to life.

Roofing, Windows & Dry-In

5.

Roofing, windows, exterior doors, and weather-protection details help secure the home from the elements.

Rough Systems

6.

Mechanical, electrical, plumbing, HVAC, fire sprinklers, low voltage, and required inspections happen behind the walls.

Exterior & Interior Finishes

7.

Stucco/siding, exterior paint, trim, drywall, cabinets, flooring, countertops, tile, paint, fixtures, and finish details come together.

Final Completion & Move-In

8.

Final inspections, punch list, cleaning, homeowner walkthrough, warranty orientation, and keys.

Latest from the Build

9915159e-1b89-4224-9241-307438a1d907.jpg

Framing has started at our 911 Alta Vista Model

Footings are in, stem wall forms and steel are being set, concrete is placement, and framing has started.

Construction Gallery

Follow the progress at 911 Alta Vista Dr. as the model home moves from early site work to foundation, framing, exterior details, and finished spaces.

Thinking about your own rebuild?

Every lot is different. Our team can help you understand plan fit, site considerations, pricing, timing, and next steps before making bigger decisions.

bottom of page